Jump to content

Station Hill development, Reading

Coordinates: 51°27′27″N 0°58′27″W / 51.45763°N 0.974212°W / 51.45763; -0.974212
From Wikipedia, the free encyclopedia

Station Hill
CGI of Station Hill
Station Hill development, Reading is located in Reading Central
Station Hill development, Reading
Location within Reading Town Centre
General information
TypeResidential, Office, Retail and Lifestyle
LocationStation Hill, Reading, England
Coordinates51°27′27″N 0°58′27″W / 51.45763°N 0.974212°W / 51.45763; -0.974212
Completed2024 (first two phases)
Cost£750 million
OwnerLincoln MGT
Design and construction
Architect(s)CallisonRTKL and Gensler
Website
www.stationhill.co.uk

The Station Hill development is a ongoing redevelopment project in Reading, England. It occupies a site between Friar Street and Station Hill in the centre of Reading, and takes its name from the latter. The development is adjacent to Thames Tower and the Reading railway station.

As of 2022, construction has started. The eventual development will comprise up to 625,000 square feet (58,100 m2) of office space, 1,300 private and affordable homes, 95,000 square feet (8,800 m2) of new lifestyle-led retail and leisure space, including potential for a 200-bed hotel and later living accommodation, and a central 2-acre (0.81 ha) piazza.[citation needed]

History

[edit]

Proposals

[edit]

A redevelopment of the land, then occupied by the disused Friars Walk shopping centre, bus station and former British Railways Western Tower offices, was initially proposed by Reading entrepreneur John Madejski, who bought the site in 2005.[citation needed]

In 2012, the Station Hill project passed to a joint venture between Benson Elliot and Stanhope. In February, they released a new £400m plan to be displayed to the public.[1] After the exhibition at the Town Hall, the developers said that the plans had received a positive response.[citation needed]

As of June 2018, Station Hill became a joint venture between Lincoln Property Company and MGT Investment Management (known as Lincoln MGT).[2] The BBC reported that the development was bought for close to £70 million from Sackville Developments.[3]

Construction

[edit]

The development was split into three phases, with construction for the first two phases underway as of 2022 and the third having received outline planning permission. Phase one was due for completion in the fourth quarter of 2023 and phase two in early-2024.[citation needed]

References

[edit]
  1. ^ "Reading's Station Hill regeneration plans on show". BBC News. 18 February 2012.
  2. ^ "Station Hill, Reading - MGT Investment Management". MGT Investment Management. Retrieved 18 July 2019.
  3. ^ "Station Hill: £500m Reading development gets new owners". BBC. 11 June 2018. Retrieved 18 July 2019.
[edit]