Jump to content

Community College station

Coordinates: 42°22′25″N 71°04′13″W / 42.3737°N 71.0702°W / 42.3737; -71.0702
From Wikipedia, the free encyclopedia
Community College
A northbound train departing Community College station in March 2024
General information
LocationAustin Street west of Rutherford Avenue
Charlestown, Boston, Massachusetts
Coordinates42°22′25″N 71°04′13″W / 42.3737°N 71.0702°W / 42.3737; -71.0702
Line(s)Haymarket North Extension
Platforms2 island platforms (1 unused)
Tracks3 (2 in regular service)
Construction
Bicycle facilities5 spaces
AccessibleYes
History
OpenedApril 7, 1975
Passengers
FY20194,159 boardings (weekday average)[1]
Services
Preceding station MBTA Following station
North Station Orange Line Sullivan Square
toward Oak Grove
Location
Map

Community College station is a rapid transit station on the MBTA Orange Line in Boston, Massachusetts. It is located in the Charlestown neighborhood off Austin Street near New Rutherford Avenue (MA-99), under the double-decked elevated structure carrying Interstate 93 to the Zakim Bunker Hill Bridge. The station is named for the adjacent Bunker Hill Community College. The station opened in April 1975, replacing the City Square and Thompson Square stations of the Charlestown Elevated. It was made accessible around 2005.

Station layout[edit]

Community College station is built under the double-decked elevated I-93 highway

Community College station is located under the double-decked elevated Interstate 93 at the southwest edge of Charlestown, Boston, just south of Bunker Hill Community College (BHCC) and west of New Rutherford Avenue (Route 99).[2] East Cambridge and the NorthPoint development are to the southwest, with the MBTA Commuter Rail Maintenance Facility and the Inner Belt District industrial park to the northwest and highway ramps to the southeast.

The station has two island platforms and three tracks. Only the west platform is in use; inbound (southbound) tracks use the west track, with outbound trains using the center track. The east platform and track are not used for revenue service. A fare mezzanine is located over the tracks at the south end of the station. The mezzanine is connected to the north sidewalk of the Gilmore Bridge, which carries Austin Street over the Orange Line and the North Station approach tracks. A footbridge also connects the mezzanine directly to BHCC.

History[edit]

Previous stations[edit]

Thompson Square station around 1970

For much of the 19th century, the four major northside railroads (the Fitchburg, Boston and Lowell (B&L), Boston and Maine (B&M), and Eastern) did not share any trackage on the approach to Boston.[3] (Not until North Union Station in 1893 did they share a depot).[4] At that time, Charlestown was separated from East Cambridge by a large cove, Millers River. The Fitchburg crossed the B&M and the Eastern at Prison Point (then the site of a substantial state prison), near the modern location of Community College station. The Fitchburg and B&M had substantial freight depots nearby, and the B&M briefly had a Charlestown station around the 1850s.[3][5][4] For some period after the Fitchburg's Boston terminal replaced its Charlestown terminal in 1848, a flag stop was made at the Prison Point Bridge.[4][6]

The Charlestown Elevated section of the Boston Elevated Railway's Main Line opened in June 1901, with three elevated stations in Charlestown. The Thompson Square station was located one-third of a mile east of the current station along Austin Street at Main Street, while the City Square station was located half a mile south along Rutherford Avenue at Chelsea Street. The elevated was unpopular with many local residents, as it was noisy and blocked out sunlight to Main Street. In 1917, the elevated structure was slated to be replaced with a more permanent subway line along the same Main Street routing, but this project was canceled by the US's entry into World War I.[7]

Community College station[edit]

The unused east platform in 2013

In the late 1960s, the MBTA began work on the Haymarket North Extension project. It included a tunnel segment north from Haymarket through a new underground stop at North Station, then under the Charles River to a portal south of the Gilmore Bridge. From there, the extension was built along the Haverhill Line commuter rail right of way. Community College station was built to replace the two elevated stops nearby in Charlestown. The new route opened to Sullivan Square on April 7, 1975.[8] The Main Line had previously been renamed as the Orange Line in 1967, as part of a systemwide rebranding by the newly formed MBTA.

Like the Sullivan Square and Wellington stations, Community College was built with a second island platform serving the outbound track plus a third express track. This extra infrastructure was to be used for the Orange Line's planned extension to Reading to replace commuter rail service on the line. (Continuing commuter rail service to Andover and Haverhill was to be via the Wildcat Branch). However, the Orange Line extension was cut short to Oak Grove due to local opposition in Melrose, and no express service ever ran. The second platform is open for outbound passengers at busy Sullivan Square and Wellington, but at less-busy Community College it sits unused.

Unlike the four other original stations on the Haymarket North Extension, Community College was not built with a busway. Bus routes in East Cambridge already terminated at Lechmere station to the west, while Charlestown routes 92 and 93 already extended to Haymarket station along historic streetcar routings.[8] Routes 111 and 112, which had terminated at City Square, were not extended to Community College; route 111 was instead extended to Haymarket, while route 112 was rerouted to Maverick.[8] In December 1975, outbound trips on route 92 were rerouted to Rutherford Avenue between Austin Street and School Street to serve BHCC and the station. However, it returned to its previous routing by December 1977.[8][9] In 1987, the MBTA considered construction of a parking garage at the station.[10]

The station was not originally accessible. An elevator to the main platform, reached by a footbridge between the platforms, was constructed as part of the Big Dig. Bidding took place in 2002.[11] Shaft framework was installed for the unused second platform, but no elevator machinery was installed. The renovations were completed around 2005.[12] The entire Orange Line, including Community College station, was closed from August 19 to September 18, 2022, during maintenance work.[13]

References[edit]

  1. ^ "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 9.
  2. ^ "Community College Station". Charlestown Patch. Archived from the original on 16 June 2013. Retrieved 12 May 2013.
  3. ^ Jump up to: a b "Boston". Atlas of the World. Rand McNally. 1891. pp. 246–247. Archived from the original on 2020-01-27. Retrieved 2013-05-14 – via Ward Maps.
  4. ^ Jump up to: a b c Barrett, Richard C. (1996). Boston's Depots and Terminals. Railroad Research Publications. pp. 5, 43, 210. ISBN 1884650031.
  5. ^ Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. p. 289. ISBN 9780942147124.
  6. ^ ABC Pathfinder Railway Guide. New England Railway Publishing Company. 1858. p. 16 – via Google Books.
  7. ^ Stone, Kenneth (21 March 2011). "What if the El Came Down in 1917?". Charlestown Patch. Retrieved 12 May 2013.
  8. ^ Jump up to: a b c d Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  9. ^ Transportation Map, Massachusetts Bay Transportation Authority, Fall 1976 – via Wikimedia Commons
  10. ^ Howe, Peter J. (December 3, 1987). "MBTA to decide soon on future of Arborway line: bus or trolley". Boston Globe. p. 32 – via Newspapers.com. Open access icon
  11. ^ Massachusetts Turnpike Authority (March 11, 2002). "Notice to Contractors". Boston Globe. p. 58 – via Newspapers.com.Open access icon
  12. ^ "Accessibility Projects at the MBTA" (PDF). Massachusetts Bay Transportation Authority. March 2005. Archived from the original (PDF) on 2016-12-20. Retrieved 2013-05-13.
  13. ^ "A Rider's Guide to Planning Ahead: Upcoming Orange & Green Line Service Suspensions" (PDF). Massachusetts Bay Transportation Authority. August 2022.

External links[edit]