Jump to content

Nay Pyi Taw International Airport

Coordinates: 19°36′54″N 96°12′46″E / 19.61500°N 96.21278°E / 19.61500; 96.21278
From Wikipedia, the free encyclopedia
Nay Pyi Taw International Airport

နေပြည်တော် အပြည်ပြည်ဆိုင်ရာ လေဆိပ်
Summary
Airport typePublic
OwnerGovernment of the Republic of the Union of Myanmar
OperatorMinistry of Transport (Myanmar)
ServesNay Pyi Taw Union Territory
LocationNay Pyi Taw, Myanmar
Opened19 December 2011; 12 years ago (2011-12-19)
Time zone MST (UTC+06:30)
Elevation AMSL109 ft / 33 m
Coordinates19°36′54″N 96°12′46″E / 19.61500°N 96.21278°E / 19.61500; 96.21278
WebsiteNaypyidaw International Airport at the Wayback Machine (archived February 2, 2018)
Map
NYT is located in Myanmar
NYT
NYT
Location of airport in Myanmar
Runways
Direction Length Surface
ft m
16/34 12,000 3,657 Concrete

Naypyidaw International Airport officially spelled Nay Pyi Taw (IATA: NYT, ICAO: VYNT), (Burmese: နေပြည်တော် အပြည်ပြည်ဆိုင်ရာ လေဆိပ်; previously known as Ela Airport), is located 16 kilometres (10 mi) southeast of Nay Pyi Taw, the capital of Myanmar. Before the foundation of Naypyidaw, this was referred to as the airport of the nearby town of Lewe. The airport officially opened on 19 December 2011.[1]

Naypyidaw airport

Construction

[edit]

The airport was designed to eventually handle up to 3.5 million passengers annually. The design of Nay Pyi Taw International Airport was drawn by CPG Consultants Pte., Ltd. of Singapore. The company previously designed the annex to Yangon International Airport, as well as Singapore's Changi Airport and several airports of Vietnam and Laos. The construction work of the airport, performed by Asia World Company, a Myanmar corporation, began in January 2009.[2] The following were built:

  • An airport building that can cope with 3.5 million passengers
  • A taxiway with 3700 metres in length and 30.5 metres in width
  • A 403 metres long and 336 metres wide apron with a total area of 135,408 square metres where 10 aircraft can park simultaneously
  • Boarding bridges
  • An annex to the airport
  • A control tower
  • A car parking and
  • Other facilities

Annually, two million international passengers plus 1.5 million local passengers totaling 3.5 million can use the main airport building which is made up of

  • the main hall with an area of 17,174 square metres
  • the east hall and west hall with an area of 3224 square metres each
  • the north hall with an area of 5912 square metres

The total area of the ground, first and second floors of the building is 63,000 square metres.

Expansion plans

[edit]

Further expansions are planned, and at their completion, the airport will have two runways and three terminals with modern facilities. The next two phases are:

The second phase of the expansion project includes adding an apron measuring 1200 feet × 1200 feet in front of the already-constructed airport building, an apron where VIP aircraft park and building four more boarding bridges at the airport building for passengers, a flight catering building, a government complex and an airport maintenance base.

The third phase includes adding 17 more boarding bridges, a dual parallel taxiway measuring 1200 ft × 100 ft, a runway measuring 12000 ft × 100 ft in front of the airport building, a set of dual parallel taxiway measuring 12,000 ft × 100 ft, four taxiways measuring 650 ft × 100 ft, four taxiways measuring 550 ft × 100 ft and an apron for cargo planes. After the third phase is completed, the airport will be able to cope with 10.5 million passengers annually and it will be more modern and sophisticated than Yangon International Airport and Mandalay International Airport.

Layout

[edit]

The airport building is a two-story building with reinforced concrete boree piles. The ground floor is for passenger arrivals and the first floor for passenger departures. The west hall is for local passengers, the east hall and the north hall for international passengers.

The approach road to the airport with two ways / four lanes is 1500 metres long. The car parking measures 200 metres by 107 metres and its total area is 21,400 square metres. The 62-metre-high control tower can control all the construction tasks of the first, second and third phases of the project.

Airlines and destinations

[edit]

Although the airport is international in name, As of 2024 mainly national airlines service the airport, offering about 20 flights a month.[3]

AirlinesDestinations
Mann Yadanarpon Airlines Heho
Myanmar National AirlinesMandalay, Yangon, Sittwe, Heho

Previously, international services were offered to Kunming and Bangkok.[4] The total number of passengers at the airport in 2013 was about 100,000, of which three quarters were domestic passengers.[4]

References

[edit]
  1. ^ Zaw Win Than (26 December 2011). "Nay Pyi Taw International Airport opens". Myanmar Times. Archived from the original on 6 May 2013. Retrieved 5 March 2012.
  2. ^ "New airport for capital: state media". Myanmar Times. 4 May 2009. Archived from the original on 4 September 2012. Retrieved 5 March 2012.
  3. ^ Flightsfrom. "All scheduled direct (non-stop) flights from Naypyidaw (NYT)".
  4. ^ a b "FMI Air ready to test out new model for Myanmar aviation market with CRJ base at Nay Pyi Taw". CAPA - Centre for Aviation. Retrieved 2024-04-04.
[edit]