Pingguoyuan station
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Pingguoyuan South Road (苹果园南路) Pingguoyuan Subdistrict, Shijingshan District, Beijing China | |||||||||||||||
Coordinates | 39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corp., Ltd | |||||||||||||||
Line(s) | Line 1 (under renovation) Line 6 Line S1 | |||||||||||||||
Platforms | 6 (1 island platform and 2 side platforms, 2 side platforms under renovation) | |||||||||||||||
Tracks | 6 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground (Line 1 & Line 6) Elevated (Line S1) | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | in service (Lines 6 & S1) Service suspended until 2024 (Line 1)[2] | |||||||||||||||
Station code | 103 (Line 1) | |||||||||||||||
History | ||||||||||||||||
Opened | April 23, 1973 December 31, 2021[3] (Lines 6 and S1) | (Line 1)|||||||||||||||
Closed | April 18, 2020[2]) | (Line 1) (for renovation until late 2024|||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.
The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2024.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.
The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.
Station layout
[edit]The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.
The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[4]
Line 6 has an underground island platform and Line S1 has 2 elevated side platforms.
Exits
[edit]There are 4 exits, lettered A, B, C, and D. All exits have a stairlift.[5] These exits are temporarily closed due to the renovation of Line 1.
There are 6 other exits, lettered E, F, G, H, I and J. Currently exits E, F, H, I and J are operational. Exits F and G are accessible via elevators, whilst exit H has a stairlift.
Gallery
[edit]Line 1
[edit]-
Station platform with exit stairs
-
Mezzanine
-
Street Level Station Hall
-
Platform middle
Line 6 & Line S1
[edit]-
Line 6 concourse
-
Line S1 concourse
References
[edit]- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
- ^ a b c "地铁1号线福寿岭站、苹果园站何时建成开通?". Archived from the original on 2022-03-19. Retrieved 2022-03-19.
且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
- ^ "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.
- ^ "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.
- ^ 1号线. Beijing Subway 北京地铁官方网站 (in Chinese). Archived from the original on 2020-04-05. Retrieved 2020-10-21.
External links
[edit]- Media related to Pingguoyuan Station at Wikimedia Commons