North Lathrop station
North Lathrop | |||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||||||||||||||
Location | West Lathrop Road Lathrop, California | ||||||||||||||||||||||||||||||||||
Coordinates | 37°49′40″N 121°16′29″W / 37.8278°N 121.2747°W | ||||||||||||||||||||||||||||||||||
Line(s) | UPRR Oakland Subdivision | ||||||||||||||||||||||||||||||||||
Platforms | 1 island platform (planned)[1] | ||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||
Parking | Yes | ||||||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||
Status | under construction | ||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||
Opening | 2027 (ACE) | ||||||||||||||||||||||||||||||||||
Future services | |||||||||||||||||||||||||||||||||||
|
North Lathrop station is a planned Altamont Corridor Express station in Lathrop, California – the second to be constructed in the city. It was expected to open to revenue service in 2023 as part of the first phase of ACE's expansion to Merced,[2][3] but was later delayed to 2027.[4]
The station is located on a segment of the former Sharpe Army Depot.[5] Whereas, the original Lathrop/Manteca station was sited as a compromise to draw commuters from both cities, this station is located closer to residential areas.
North Lathrop is designed as a transfer station to allow passengers from San Joaquin Valley shuttle trains to transfer to services bound for San Jose.[6] The station is also planned to serve as a future northern terminus of Valley Link, a project by the Tri-Valley-San Joaquin Valley Regional Rail Authority to build a rail connection to Bay Area Rapid Transit's Dublin/Pleasanton station.[7] Up to 3,500 parking spaces may be built to accommodate future park and ride demand by 2040.[5]
References
[edit]- ^ "Final Environmental Impact Report: Appendix C-8 - Prelim Engineering Plans" (PDF). SJRRC. Retrieved June 11, 2019.[dead link]
- ^ "ACE Extension Lathrop to Ceres/Merced Draft EIR Executive Summary ES.3.1.2 Operation and Maintenance" (PDF). San Joaquin Regional Rail Commission. Archived from the original (PDF) on January 15, 2019. Retrieved January 14, 2019.
- ^ Holland, John (April 27, 2018). "Expanded train service coming to Modesto, Merced; what it means for commuters". Modesto Bee. Retrieved April 28, 2018.
- ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.
- ^ a b Wyatt, Dennis (May 27, 2021). "Valley Link will require parking lot for up to 3,500 vehicles in Lathrop". Manteca Bulletin. Retrieved May 27, 2021.
- ^ "Draft Environmental Impact Report". ACE. Retrieved May 13, 2020.[permanent dead link]
- ^ "Valley Link Final Feasibility Report" (PDF). Dropbox. Tri-Valley-San Joaquin Valley Regional Rail Authority. Retrieved October 17, 2019.