400-series highways
400-series highways | |
---|---|
| |
System information | |
Maintained by Ministry of Transportation of Ontario (MTO) | |
Length | 1,997.3 km[1] (1,241.1 mi) |
Formed | July 1, 1952 |
Highway names | |
Provincial | Ontario Highway 4XX |
System links | |
The 400-series highways are a network of controlled-access highways in the Canadian province of Ontario, forming a special subset of the provincial highway system. They are analogous to the Interstate Highway System in the United States or the Autoroute system of neighbouring Quebec, and are regulated by the Ministry of Transportation of Ontario (MTO). The 400-series designations were introduced in 1952, although Ontario had been constructing divided highways for two decades prior. Initially, only Highways 400, 401 and 402 were numbered; other designations followed in the subsequent decades. To this day, not all controlled-access highway in Ontario are a part of the 400-series highway network. The network is situated almost entirely in Southern Ontario, although Highway 400 extends into the more remote northern portion of the province.
Modern 400-series highways have high design standards, speed limits of 100 kilometres per hour (62 mph), with a 110 kilometres per hour (68 mph) limit on select stretches, and various collision avoidance and traffic management systems. The design of 400-series highways has set the precedent for a number of innovations used throughout North America, including the parclo interchange and a modified Jersey barrier design known as the Ontario Tall Wall. As a result, they currently experience one of the lowest accident and fatality rates comparative to traffic volume in North America.
History
[edit]When the 400-series designations were first applied to Ontario freeways in 1952,[2] several divided highways had already been opened in Southern Ontario.[3] Originally inspired by German Autobahns, Minister of Highways Thomas McQuesten planned a network of "Dual Highways" across the southern half of the province during the 1930s.[4][5] The Queen Elizabeth Way (QEW) was first, an upgrade to the partially constructed Middle Road in 1934.[6] McQuesten also sought out the economic opportunities that came with linking Toronto to Detroit and New York state by divided roadways with interchanges at major crossroads. Although he no longer served as Minister of Highways by the onset of World War II, his ambitious plans would come to fruition in the following decades as Highways 400, 401, 402, 403 (between Woodstock and Hamilton), and 405.[7]
The construction boom following the war resulted in many new freeway construction projects in the province. The Toronto–Barrie Highway (Highway 400), Trans-Provincial Highway (Highway 401),[8] a short expansion of Highway 7 approaching the Blue Water Bridge in Sarnia (Highway 402),[9] and an expansion of Highway 27 (eventually designated as Highway 427 by the mid-1970s) into part of the Toronto Bypass were all underway or completed by the early 1950s.[8] Seeking a way to distinguish the controlled-access freeways from the existing two-lane King's Highways, the Department of Highways created the 400-series designations in 1952. By the end of the year, Highway 400, 401, and 402 were numbered, although they were only short stubs of their current lengths.[2] Highway 401 was assembled across the province in a patchwork fashion,[8] becoming fully navigable between Windsor and the Quebec border on November 10, 1964;[10] Highway 400 was extended north to Coldwater on Christmas Eve 1959;[11] Highway 402 was extended to London between 1972 and 1982.[12][13]
In addition to this network backbone, plans for additional 400-series highways were initiated by the late 1950s, comprising the Chedoke Expressway (Highway 403) through Hamilton;[14] the Don Valley Parkway Extension (Highway 404) northward from the soon-to-be constructed Toronto expressway;[15] Highway 405 to connect with the American border near St. Catharines;[16] Highway 406 south from St. Catharines to Welland;[17] Highway 407 encircling the Greater Toronto Area (GTA), though not built for another 40 years;[18] Highway 409 to connect Highway 401 with Toronto International Airport;[19] and The Queensway (Highway 417) through Ottawa.[20] The first sections of these freeways were opened in 1963,[21] 1977,[22] 1963,[21] 1965,[23] 1997,[24] 1974,[25] and 1960,[26] respectively.
Throughout the 1960s and 1970s, additional freeways were planned or built, including Highway 427 in Toronto,[27] Highway 403 through Mississauga,[28] Highway 410 north to Brampton and Highway 416 to connect Highways 401 and 417.[29][30] Highway 420 was designated in Niagara Falls,[2][31] though it had been built as part of the QEW in 1941.[32] Other major works included the skyway bridges along the QEW and the expansion of Highway 401 through most of Toronto into twelve-lane collector–express systems.[8][33][34]
By the mid-1980s, the network had more-or-less taken its current shape, with only Highways 407, 412, 416 and 418 yet to be built.[35][36] Instead, emphasis was placed on expanding existing routes to accommodate increasing traffic volumes.[18] However, extensions of Highway 400 towards Parry Sound,[37] Highway 403 between Woodstock and Hamilton,[38] Highway 404 towards Newmarket,[39] and Highway 427 towards Vaughan were underway.[40] By the end of the decade, construction of Highway 407 and Highway 416 had begun,[18][41] and Highway 410 was expanded from two to four lanes.[42]
Highways 407 and 416 opened in the late 1990s.[24][43] Until early 2015, Highways 407 and 416 were the most-recently designated (and constructed) freeways in Ontario. This has changed with the construction of Highways 412 and 418. In addition to these new additions to the 400-series network, several extensions of existing freeways have been built or are underway,[36] including Highway 410 north of Brampton in 2009,[44] Highway 400 to north of Parry Sound in 2010,[45] Highway 417 to Arnprior in 2012,[46] Highway 404 to Keswick in 2014,[47] Highway 401 through Windsor in 2015,[48] and four-laning Highway 406 to Welland in late 2015.[49]
Design standards
[edit]The 400-series highways always have a minimum 4 lane cross-section with grade separation at all junctions. Interchanges tend to be spaced at least 1.5 kilometres apart in urban areas unless there are basket weave ramps or collector lanes to facilitated shorter merge distances. In rural areas, interchanges tend to be spaced at least 3 kilometres apart, although exceptions exist. When the cross-section of highway is larger than 10 lanes, the road is usually arranged into a local–express lane system, which exist on sections of Highways 400, 401, 403, 404 and 427. On all but a few interchanges in the whole system, ramps merge freely on the highway except if there are ramp meters in use, and stop or yield controlled ramps are rare. An interchange with stop-controlled ramps onto Highway 400 at Canal Road is currently scheduled for replacement.
While older freeways have some lapses in safety features, contemporary 400-series highways have design speeds of 130 km/h (81 mph), speed limits ranging from 80 km/h (50 mph) to 110 km/h (68 mph), various collision avoidance and traffic management systems, and several design standards adopted throughout North America.[50] Of note are the Ontario Tall Wall median barrier and the Parclo A-4 interchange design, the latter which became standard in the design for the widening of Highway 401 through Toronto in 1962. The Institute of Traffic Engineers subsequently recommended this design to replace the cloverleaf interchange throughout North America.[51][52] Ontario highways rank fourth in North America for fatality rates, with 0.61 fatalities per 10,000 licensed drivers in 2017. However, this also includes two-lane provincial highways.[53] On May 1, 2019, the government of Ontario was looking towards raising the speed limits of the 400-series highways up to 120 km/h (75 mph). Jeff Yurek had stated that "The 400-series highways were built for, I believe, a speed limit of 120 km/h safely."[54] A 110 km/h (68 mph) trial was set up on three stretches of highways on September 26, 2019 to test the viability of increasing speed limits.[55] The three trialed sections along with three more sections were permanently changed to the higher speed limit on April 22, 2022, and two more sections were trialed.[56] The two trialed sections were made permanent along with 10 more sections on July 12, 2024.[57][58]
Conforming with the Manual on Uniform Traffic Control Devices, Ontario utilizes green signs for guidance purposes, including distances to nearby interchanges and destinations.[59] Generally, blue signage is used to list services and attractions at upcoming exits, known as Tourism-Oriented Directional Signing.[60] However, several exceptions exist, notably blue guidance signage for toll highways such as Highway 407, in addition to the collector lanes of highways.[59] The baseline standard for the construction of or expansion to a freeway in Ontario is an average daily traffic count of 10,000 vehicles per day. However, other factors are considered as well, particularly future traffic volume forecasts. To promote economic development in a disadvantaged region (e.g., the current extension of Highway 400 to Northern Ontario), a 400-series highway may be built where the existing highway's traffic counts fall below 10,000.[61]
The MTO plans and finances the construction and maintenance of the King's Highway system, which includes the 400-series network.[62] The system includes 1,971.8 kilometres (1,225.2 mi) of freeways. Highway 401 is the longest freeway at 828.0 kilometres (514.5 mi), in addition to being the widest and busiest road in Canada. Highway 420 is the shortest of the routes at 3.3 kilometres (2.1 mi).[1]
There are four examples of 400 series standard highways in Ontario that are not signed as such. The Gardiner Expressway between Highway 427 and Parklawn Road was originally built as a section of QEW (Hwy 451) and therefore is built to 400-series standards but lost its QEW designation after being downloaded to the City of Toronto. The section of Highway 7 between the town of Carleton Place and its junction with Highway 417 is also built to 400-series standards, but a 400-series designation has yet to be applied. Highway 69 between Sudbury and Key River is built to 400-series standards in anticipation of it becoming part of Highway 400 once the 70-kilometre (43 mi) gap between the two freeways is filled. Highway 115 north of Highway 35/Highway115 concurrency and Peterborough is also built to 400-series standards, however a 400-series designation has yet to be applied. Most other freeways and expressways in Ontario that lack a 400-series designation have lower construction standards, lower design speeds and lower speed limits.
High-occupancy vehicle lanes
[edit]The MTO began planning for the use of high-occupancy vehicle (HOV) lanes with the HOV Opportunities Study, contracted to McCormick Rankin in 2001. This led to the test trial of three HOV lanes in the GTA in December 2005: southbound Highway 404 between Highway 7 and Highway 401, with a dedicated HOV ramp built to connect with westbound Highway 401, and Highway 403 in both directions between Highway 407 and Highway 401 in Mississauga.[63] Since then, HOV lanes have been opened on several 400-series freeways around the Golden Horseshoe and National Capital Region. In May 2007, the MTO introduced a multibillion-dollar Horseshoe Network Project, which included plans to incorporate HOV lanes into numerous 400-series highways.[64]
By then, work was already advanced on several projects, including the northbound HOV lane on Highway 404 (that opened on July 23, 2007) and an HOV lane along both directions of Highway 403 between Highway 407 and Highway 401. A third pair of HOV lanes has since been introduced to the QEW/403 through Oakville, and a fourth individual HOV lane travels eastbound on Highway 417 from just west of Eagleson Road in Ottawa to just east of Moodie Drive.[64]
More than 450 kilometres (280 mi) of HOV lanes are currently proposed for construction by 2031. Future plans include extending existing HOV lanes and introducing them to other 400-series freeways.[65] as of October 2014[update], two projects have been confirmed: Highway 410 between Highway 401 and Queen Street in Brampton, and Highway 427 between Highway 409 and Highway 7. The MTO has stated that HOV lanes will only be introduced through new construction and that no general-purpose lanes will be converted. The general goals of the project are to help increase highway efficiency (an HOV lane is claimed by the Ontario government to have the ability to move as many people as four general-purpose lanes),[65] reduce congestion, conserve energy and help protect the environment.[66]
During the 2015 Pan American Games and 2015 Parapan American Games held in Toronto, several HOV lanes had their minimum requirements increased from two passengers to three, and some highways had their general-purpose lanes temporarily converted to HOV lanes to accommodate increased traffic. These temporary restrictions lasted from June 29 to August 18.[67]
2021 saw several new HOV lanes opened. The southbound HOV lane on Highway 400 between King Road and Major Mackenzie Drive was opened on September 11, 2021; while the northbound lane opened two months later on November 11. The Highway 427 extension, which opened on September 18, included an HOV lane north of Finch Avenue.[68][69][70][71]
Future HOV lanes
[edit]The following table lists planned expansions to the HOV network by 2031.[65][72]
Highway | Starting location | Terminating location | General location | Status |
---|---|---|---|---|
400 | King Road | Lloydtown-Aurora Road | Region of York | Lane construction underway |
404 | Highway 7 | Stouffville Road | Region of York | Lane and bridge construction underway |
Highway | Starting location | Terminating location | General location |
---|---|---|---|
400 | Langstaff Road | Major Mackenzie Drive | Regional Municipality of York |
400 | Lloydtown-Aurora Road | Highway 88/Bradford West Gwillimbury | Region of York and Simcoe County |
401 | Regional Road 25 | Halton-Wellington Boundary | Regional Municipality of Halton |
404 | Stouffville Road | Ravenshoe Road | Region of York |
QEW | Red Hill Valley Parkway | Highway 406 | Hamilton and Region of Niagara |
QEW | 407/403 | Guelph Line | Burlington |
QEW | Trafalgar Road | Winston Churchill Boulevard | Oakville and Mississauga |
Planned extensions and new routes
[edit]Highway | Type | Length (km) | Length (mi) | Southern or western terminus | Northern or eastern terminus | Status | Proposed Opening Date | Notes |
---|---|---|---|---|---|---|---|---|
Highway 400 | Extension[73] | ~138 | ~86 | Regional Road 559 near Parry Sound | Highway 17 in Sudbury | Partially Open / Under Construction | Late 2020s | Completed sections numbered as Highway 69 |
Highway 401 | Extension[74] | ~3 | ~2 | I-75 in Detroit | Ojibway Parkway in Windsor | Under Construction | 2025 | Part of Gordie Howe International Bridge Project |
Highway 404 | Extension[75] | ~31 | ~19 | Regional Road 8 in Keswick | Highway 12 north of Sunderland | Proposed | Late 2020s | |
Highway 410 | Extension[76] | ~3 | ~2 | Highway 10 in Brampton | Future Highway 413 north of Brampton | Funded | Late 2020s | Part of the Highway 413 project |
Highway 413 | New Route[76] | ~52 | ~32 | Highway 401 and Highway 407 in NW Mississauga | Highway 400 north of Vaughan | Funded | Late 2020s | |
Highway 417 | Extension[77] | ~16 | ~10 | Highway 60 in Renfrew | Campbell Drive west of Arnprior | Proposed | Late 2020s | |
Highway 427 | Extension[76] | ~2 | ~2 | Regional Road 49 south of Bolton | Future Highway 413 South of Bolton | Funded | Late 2020s | Part of the Highway 413 project |
"Bradford Bypass" | New Route[78] | ~16 | ~10 | Highway 400 near Bradford | Highway 404 south of Keswick. | Funded | Late 2020s | Intended to be a 400 series standard highway, designation is unclear. Construction began at the Yonge Street interchange in November 2022 |
Existing network
[edit]Number | Length (km) | Length (mi) | Southern or western terminus | Northern or eastern terminus | Local names | Formed | Removed | Notes |
---|---|---|---|---|---|---|---|---|
Highway 400 | 226.0 | 140.4 | Maple Leaf Drive in Toronto (continues as Black Creek Drive) |
Highway 69 in Carling | Toronto–Barrie Highway | [79] | 1952current | Scheduled for extension to Sudbury.[79] |
Highway 401 | 828.0 | 514.5 | Ojibway Parkway in Windsor | A-20 towards Montreal, QC | Macdonald–Cartier Freeway, Rt. Hon. Herb Gray Parkway, Highway of Heroes | [79] | 1952current | Busiest highway in North America.[80] Scheduled for extension to American border following completion of the Gordie Howe International Bridge. |
Highway 402 | 102.5 | 63.7 | I-69 / I-94 at Canada–United States border on Blue Water Bridge in Point Edward | Highway 401 in London | [9] | 1953current | ||
Highway 403 | 125.2 | 77.8 | Highway 401 near Woodstock | Highway 401 / Highway 410 in Mississauga | Chedoke Expressway, Alexander Graham Bell Parkway | [21] | 1963current | |
Highway 404 | 50.1 | 31.1 | Highway 401 / DVP in Toronto | Regional Road 8 (Woodbine Avenue) in East Gwillimbury | [22] | 1977current | ||
Highway 405 | 8.7 | 5.4 | Queen Elizabeth Way – St. Catharines | I-190 at Canada–United States border on Queenston-Lewiston Bridge towards Lewiston, NY | General Brock Parkway | [21] | 1963current | |
Highway 406 | 26.0 | 16.2 | East Main Street in Welland | Queen Elizabeth Way in St. Catharines | [23] | 1965current | ||
Highway 407 | 151.4 | 94.1 | Highway 403 / Queen Elizabeth Way in Burlington | Highway 35 / Highway 115 in Clarington | [81] | 1997current | Tollway divided into two sections; Highway 407E and 407 ETR, with the latter privately operated[82] | |
Highway 409 | 5.6 | 3.5 | Pearson Airport in Mississauga | Highway 401 in Toronto | Belfield Expressway | [83] | 1978current | |
Highway 410 | 20.3 | 12.6 | Highway 401 / Highway 403 in Mississauga | Highway 10 (Hurontario Street) in Caledon | [84] | 1978current | ||
Highway 412 | 10.0 | 6.2 | Highway 401 in Whitby | Highway 407 in Whitby | West Durham Link | [85] | 2016current | Route number assigned February 5, 2015[86] tolls removed, effective April 5, 2022[87] |
Highway 416 | 76.4 | 47.5 | Highway 401 towards Brockville | Highway 417 in Ottawa | Veterans Memorial Highway | [43] | 1999current | |
Highway 417 | 192.0 | 119.3 | Highway 17 in Arnprior | A-40 (TCH) towards Montreal, QC | Queensway, Trans-Canada Highway | [26] | 1971current | Unlike most freeways, kilometre posts are numbered east to west. |
Highway 418 | 12.8 | 8.0 | Highway 401 in Clarington | Highway 407 in Clarington | East Durham Link | [88] | 2019current | Route number assigned February 5, 2015.[86] tolls removed, effective April 5, 2022[87] |
Highway 420 | 3.3 | 2.1 | Regional Road 98 (Montrose Road) | US 62 at Canada–United States border on Rainbow Bridge in Niagara Falls | Niagara Veterans Memorial Highway | [89] | 1941current | |
Highway 427 | 27 | 17 | Queen Elizabeth Way/Gardiner Expressway in Toronto | Regional Road 25 (Major Mackenzie Drive) in Vaughan | [27] | 1971current | 6.6 km (4.1 mi) extension to Regional Road 25 (Major Mackenzie Drive) opened September 18, 2021 | |
Queen Elizabeth Way | 139.1 | 86.4 | I-190 at Canada–United States border on Peace Bridge in Fort Erie | Highway 427/Gardiner Expressway in Toronto | [90] | 1937current | Internally referred to as Highway 451 in the Ontario Ministry of Transportation | |
Gallery
[edit]-
Highway 401 south of Pearson Airport is the widest freeway in Canada, and one of the widest and busiest in the world
-
Aerial view of the interchange between Highway 401, 403 and 410 in Mississauga
-
An aerial view of Highway 416 approaching Ottawa
-
A sprawling interchange between Highway 409 and 427 in Etobicoke, one of several in the Greater Toronto Area
-
The Parclo interchange design is used throughout the 400-series network
See also
[edit]- List of provincial highways in Ontario
- 100-Series Highways of Nova Scotia
- 400-series Highways of British Columbia
- Quebec Autoroutes
References
[edit]Sources
[edit]- ^ a b Ministry of Transportation of Ontario (2010). "Annual Average Daily Traffic (AADT) counts". Government of Ontario. Archived from the original on July 6, 2011. Retrieved March 29, 2016.
- ^ a b c Walter, Karena (February 21, 2014). "Search Engine: Highway Mysteries Solved". The Niagara Falls Review. Archived from the original on December 22, 2015. Retrieved December 17, 2015.
- ^ Robins, C.P. (1952). Ontario Road Map (Map). Ontario Department of Highways. § Q28–U41.
- ^ "Hopes to Improve Roads". The Gazette. Montreal. February 18, 1936. p. 14. Archived from the original on October 19, 2021. Retrieved February 9, 2010.
- ^ Stamp (1987), pp. 11–12.
- ^ English, Bob (March 16, 2006). "Remember That 'Little Four-Lane Freeway?'". The Globe And Mail. Toronto.
...the freeway concept was promoted by Hamiltonian Thomas B. McQuesten, then the highway minister. The Queen Elizabeth Way was already under construction, but McQuesten changed it into a dual-lane divided highway, based on Germany's new autobahns.
- ^ Stamp (1987), p. [page needed].
- ^ a b c d Shragge, John G. (2007). "Highway 401: The Story". Archived from the original on March 28, 2008. Retrieved February 12, 2010.
- ^ a b Built Heritage, Cultural Landscape and Planning Section (January 2006). "2.0 Background History" (PDF). Heritage Impact Assessment: Christina Street Bridge over Highway 402, Sarnia (Report). Archaeological Services Inc. p. 4. Archived (PDF) from the original on September 23, 2020. Retrieved January 6, 2014.
- ^ Ministry of Transportation and Communications (1972), pp. 8–9.
- ^ "Open 400 Link to Coldwater". The Toronto Star. December 24, 1959. p. 18.
The new, 22-mile extension from south of Crown Hill to Coldwater will be ready for traffic this afternoon.
- ^ Highway Construction Program: King's and Secondary Highways. Ministry of Transportation and Communications. 1972–1973. p. xi.
- ^ Annual Report (Construction ed.). Ministry of Transportation and Communications. 1982–1983. p. 76.
- ^ Annual Report for the Fiscal Year (Report). Ontario Department of Highways. March 31, 1958. Retrieved July 25, 2010.
- ^ Don Valley Parkway Extension, Highway 401 to Steeles Avenue (Report). Desjardines. 1957.
- ^ "Above the Regular Budget". The Ottawa Citizen. July 31, 1958. p. 7. Archived from the original on August 14, 2022. Retrieved October 20, 2010.
- ^ Annual Report. Department of Highways. March 31, 1961. Retrieved July 29, 2011.
- ^ a b c Sewell, John (2009). The Shape of the Suburbs: Understanding Toronto's Sprawl. University of Toronto Press. p. 72. ISBN 978-0-8020-9884-9. Retrieved July 1, 2010.
- ^ Hicks, Kathleen A. (2006). "Road Controversy - 1968". Malton: Farms to Flying (PDF). Friends of the Mississauga Library System. pp. 208–209. ISBN 0-9697873-9-1. Archived (PDF) from the original on November 25, 2020. Retrieved April 4, 2010.
- ^ Robertson, Peter. "The Queensway Began with a Royal Blast: Flashback to 1957". Carlington Community Association. Archived from the original on April 26, 2012. Retrieved December 17, 2015.
- ^ a b c d Ontario Department of Highways (1970), p. 11.
- ^ a b Construction Program: King's and Secondary Highways (Report). Ministry of Transportation and Communications. 1976–1977. p. XV.
- ^ a b Ontario Department of Highways (1970), p. 12.
- ^ a b Settlement of Claim of Richard Prendiville (PDF) (Report). Ontario Superior Court of Justice. December 12, 2001. p. 7. Archived from the original (PDF) on July 27, 2014. Retrieved December 17, 2015.
- ^ Construction Program: King's and Secondary Highways (Report). Ministry of Transportation and Communications. 1976–1977. p. XIV.
- ^ a b Clark, Glenn (April 14, 2012). A Historical Timeline for the Township of Gloucester. The Gloucester Historical Society. Archived from the original on August 21, 2012. Retrieved July 1, 2012.
- ^ a b "Highway 27 Interchange Fully in Service". The Globe and Mail. Toronto. December 4, 1971. p. 5.
- ^ Coleman, Thomas (July 12, 1975). "Drivers Will Wait Years Before Relief from QEW Jams". The Globe and Mail. Toronto. p. 5.
- ^ The History of Toronto's Unfinished Expressway System (Report). Energy Probe. April 5, 2009. Archived from the original on September 19, 2020. Retrieved January 23, 2012.
- ^ "New 45-Mile Highway to Link Ottawa with 401". The Globe and Mail. Toronto. November 14, 1967. p. 4.
- ^ "Queen Elizabeth Way - Hamilton to Fort Erie". Highway Construction Program 1972-73 (Report). Ministry of Transportation and Communications. April 1972. p. xv.
- ^ Stamp (1992), p. 129.
- ^ Stamp (1987), pp. 59–61.
- ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1964. p. 296.
- ^ Cartography Section (1986). Ontario Road Map (Map). Ministry of Transportation and Communications.
- ^ a b Cartography Section (2014–2015). Ontario Road Map (Map). Ministry of Transportation of Ontario.
- ^ Ministry of Transportation of Ontario (May 2000). "Highway 69 Four-Laning Port Severn to Parry Sound" (PDF). Government of Ontario. Archived from the original (PDF) on August 23, 2000. Retrieved December 27, 2011.
- ^ Transportation Capital Branch (1991–1992). "Provincial Highways Construction Projects". Northern Transportation, Construction Projects. Ministry of Transportation: 7. ISSN 0714-1149.
- ^ Dexter, Brian (October 25, 1989). "Ontario Studies Plan to Extend Highway 404 Farther North". News. The Toronto Star. p. A8.
- ^ Provincial Highways Construction Projects (Report). Ministry of Transportation. 1989–1990. p. 13. ISSN 0714-1149.
- ^ Transportation Capital Branch (May 1991). Northern Transportation Construction Projects 1988–89 (Report). Ministry of Transportation of Ontario. p. 16. ISSN 0714-1149.
- ^ Transportation Capital Branch (1986–1987). "Provincial Highways Construction Projects". Northern Transportation, Construction Projects. Ministry of Transportation and Communications: XII. ISSN 0714-1149.
- ^ a b "Ottawa Highway Link Opens". Ontario. Toronto Star. Canadian Press. September 24, 1999. p. A4.
- ^ Abrey, Heather (November 20, 2009). "Hwy 410 Extension Causing Confusion". Caledon Enterprise. North Peel Media Group. Archived from the original on September 17, 2020. Retrieved December 17, 2015.
- ^ Ginn, Cameron (October 27, 2010). "$177-Million Section of Highway Now Open". Cottage Country Now. Metroland Media Group. Archived from the original on September 25, 2020. Retrieved December 17, 2015.
- ^ Chase, Sean (November 30, 2012). "Highway 417 opens at Arnprior". The Pembroke Observer. Canoe Sun Media. Archived from the original on June 27, 2018. Retrieved December 2, 2012.
- ^ Bradley, Dave (September 17, 2014). "Highway 404 Extension Opens". NewsTalk 1010. Archived from the original on December 23, 2014. Retrieved September 17, 2014.
- ^ "Newsroom: Highway 401 Section of the New Rt. Hon. Herb Gray Parkway Now Complete". News.Ontario.ca. Ministry of Transportation. November 20, 2015. Archived from the original on July 14, 2017. Retrieved November 21, 2015.
- ^ Forsyth, Paul (August 19, 2011). "406 Widening Underway". Niagara This Week. Metroland Media. Archived from the original on September 17, 2020. Retrieved December 17, 2015.
- ^ Revie, Nancy (September 19, 2005). "An Expressway in Name Only". The Guelph Mercury. p. A9.
- ^ Proceedings ... Annual Meeting (Report). Institute of Traffic Engineers. 1962. pp. 100–103.
- ^ "Partial Cloverleaf Interchange (Parclo)". The Canadian Design Resource. Archived from the original on March 17, 2015. Retrieved June 4, 2015.
- ^ Road Safety Policy Office - Vehicles (2017). "Overview" (PDF). Ontario Road Safety Annual Report (Report). Government of Ontario. p. 21. ISSN 1710-2480. Archived (PDF) from the original on March 17, 2021. Retrieved March 7, 2021.
- ^ Rodrigues, Gabby (May 1, 2019). "Ontario to Look At Raising Speed Limits Across 400-Series Highways". Global News. Archived from the original on May 6, 2019. Retrieved May 6, 2019.
- ^ "Consultation: Speed Limits on Ontario Highways". Ministry of Transportation of Ontario. Archived from the original on December 31, 2020. Retrieved March 7, 2021.
- ^ Brasier, Dakota; Ikotun, Simisola (March 29, 2022). "Ontario Raising Highway Speed Limits" (Press release). Ministry of Transportation of Ontario. Retrieved July 13, 2024.
- ^ "Raising Speed Limits on Ontario Highways". Ministry of Transportation of Ontario. July 12, 2024. Retrieved July 13, 2024.
- ^ Brasier, Dakota; Blazina, Tanya (April 24, 2024). "Ontario Raising Highway Speed Limits" (Press release). Ministry of Transportation of Ontario. Retrieved July 13, 2024.
- ^ a b Ministry of Transportation of Ontario (May 2010). "Ontario Traffic Manual Book 8: Guide and Information Signs – Volume 1" (PDF). Government of Ontario. p. 18. Archived from the original (PDF) on March 8, 2016. Retrieved February 24, 2016.
- ^ Ministry of Tourism, Culture and Sport (November 23, 2015). "Tourism-Oriented Directional Signing (TODS) Program". Government of Ontario. Archived from the original on September 28, 2017. Retrieved February 24, 2016.
- ^ Ministry of Northern Development and Mines (June 2005). Highway 69 Action Plan (PDF) (Report). Government of Ontario. p. 3. Archived from the original (PDF) on March 9, 2014. Retrieved February 25, 2016.
- ^ "Highway Traffic Act". Government of Ontario. 2016. Archived from the original on November 22, 2009. Retrieved May 8, 2016.
- ^ Nikolic, Goran; Pringle, Rob (2008). Evaluating HOV Plans and Priorities – the Case of Expressways in the GTA (PDF) (Report). Transportation Association of Canada. pp. 2–4. Archived (PDF) from the original on December 22, 2015. Retrieved January 1, 2016.
- ^ a b Ministry of Transportation of Ontario (May 24, 2015). "McGuinty Government To Improve Commuters Lives With HOV Lane Network" (Press release). CNW Group. Archived from the original on March 4, 2016. Retrieved January 1, 2016.
- ^ a b c Ministry of Transportation of Ontario. "Ontario's High Occupancy Vehicle Lane Network Plan for the 400-Series Highways in the Greater Golden Horseshoe". Government of Ontario. Archived from the original on October 18, 2014. Retrieved June 9, 2015.
- ^ "The Big Move - Strategy #3 - Improve the Efficiency of the Road and Highway Network". Metrolinx. Archived from the original on February 6, 2017. Retrieved June 9, 2015.
- ^ Shum, David (June 29, 2015). "HOV Lane Restrictions Now in Effect for Pan Am Games". Global News. Archived from the original on September 11, 2018. Retrieved August 22, 2015.
- ^ "Adding More Lanes to Highway 400 to Keep People Moving". Ontario. Archived from the original on July 22, 2021. Retrieved July 22, 2021.
- ^ Lecce, Stephen [@sflecce] (September 10, 2021). "Excited to report that the new southbound HOV lanes on Highway 400 in the #KingTownship & #Vaughan community will open tomorrow!" (Tweet) – via Twitter.
- ^ "Ontario Opens Highway 427 Expansion". Ministry of Transportation of Ontario. September 16, 2021. Archived from the original on March 17, 2022. Retrieved September 18, 2021.
- ^ Ministry of Transportation of Ontario [@sflecce] (November 11, 2021). "Northbound HOV lanes on Highway 400 in the Vaughan area open by tonight!" (Tweet) – via Twitter.
- ^ "Ontario's highway programs". Ontario Ministry of Transportation. May 28, 2020. Archived from the original on March 7, 2022. Retrieved August 2, 2020.
- ^ "Connecting the North: A Draft Transportation Plan for Northern Ontario". Province of Ontario. 2020. Archived from the original on June 18, 2022. Retrieved June 18, 2022.
- ^ "Project Overview". Gordie Howe International Bridge. 2022. Archived from the original on July 11, 2021. Retrieved June 8, 2022.
- ^ "Connecting the GGH: A Transportation Plan for the Greater Golden Horseshoe". Province of Ontario. 2022. Archived from the original on June 18, 2022. Retrieved June 18, 2022.
- ^ a b c "Preferred Route Factsheet" (PDF). Highway 413. April 2022. Archived (PDF) from the original on March 26, 2022. Retrieved June 8, 2022.
- ^ "Connecting the East: A draft transportation plan for eastern Ontario". Province of Ontario. 2022. Archived from the original on June 18, 2022. Retrieved June 18, 2022.
- ^ "OVERVIEW - BRADFORD BYPASS". Bradford Bypass. 2020. Archived from the original on May 24, 2022. Retrieved June 8, 2022.
- ^ a b c Shragge & Bagnato (1984), pp. 89–92.
- ^ Maier, Hanna (October 9, 2007). "Chapter 2". Long-Life Concrete Pavements in Europe and Canada (Report). Federal Highway Administration. Archived from the original on May 27, 2010. Retrieved May 1, 2010.
The key high-volume highways in Ontario are the 400-series highways in the southern part of the province. The most important of these is the 401, the busiest highway in North America, with average annual daily traffic (AADT) of more than 425,000 vehicles in 2004 and daily traffic sometimes exceeding 500,000 vehicles.
- ^ Mitchell, Bob (June 6, 1997). "At Last — Opening Bell Tolls for the 407". The Toronto Star. pp. A1, A6.
- ^ "Map / Toll Calculator". 407 ETR. February 1, 2014. Archived from the original on February 2, 2021. Retrieved December 17, 2015.
- ^ "New Shortcut Will Let Some 'Fly' to Airport". Metro News. The Toronto Star. August 19, 1978. p. A6.
Highway 409, a new shortcut to Toronto International Airport, opens next Friday
- ^ Public and Safety Information Section (November 9, 1978). "Highway 410 Opens November 15" (Press release). Ministry of Transportation and Communications.
- ^ Pessian, Parvaneh (June 17, 2016). "UPDATE: Hwy. 407 From Pickering to Oshawa Opens June 20: Toll Free Until End of 2016". Whitby This Week. Archived from the original on December 13, 2017. Retrieved June 17, 2016.
- ^ a b "New Highway Numbers". Highway 407 East. Archived from the original on April 19, 2015. Retrieved February 10, 2015.
- ^ a b Alberga, Hannah (April 5, 2022). "'Unfair tolls': Ford officially scraps tolls on two Ontario highways". CTV News Toronto. Archived from the original on April 6, 2022. Retrieved April 6, 2022.
- ^ "Extension of Ontario Hwy. 407, new Hwy. 418 open east of Toronto". On-Site Magazine. On-Site. December 9, 2019. Archived from the original on December 12, 2019. Retrieved December 11, 2019.
An eastern extension of Ontario Hwy. 407 and a new toll road to connect the lengthened highway to nearby Hwy. 401 opened Dec. 9 on the outskirts of Toronto.
- ^ Stamp (1987), pp. 124–127.
- ^ Shragge & Bagnato (1984), pp. 79–81.
Bibliography
[edit]- Shragge, John; Bagnato, Sharon (1984). From Footpaths to Freeways. Ontario Ministry of Transportation and Communications, Historical Committee. ISBN 0-7743-9388-2.
- Stamp, Robert M. (1987). QEW: Canada's First Superhighway. The Boston Mills Press. ISBN 0-919783-84-8.
- Stamp, Robert M. (1992). Bridging the Border: Structures of Canadian–American Relations. Toronto: Dundurn Press. ISBN 1-55002-074-9.
- '401' The Macdonald–Cartier Freeway. Toronto: Ministry of Transportation and Communications. 1972.
- AADT Traffic Volumes 1955–1969 and Traffic Collision Data 1967–1969. Ontario Department of Highways. 1970.
External links
[edit]- Ontario Ministry of Transportation Archived May 11, 2008, at the Wayback Machine
- Highway Construction Programs Archived December 19, 2015, at the Wayback Machine
- Photographs and history on the 400-Series Highways (and other provincial highways, too)
- Dirt Roads to Freeways … And All That Archived June 25, 2023, at the Wayback Machine, ca. 1978, Archives of Ontario YouTube Channel