Kostroma Nuclear Power Plant

Kostroma NPP
GenerationGeneration III+ reactor
Reactor conceptWater-moderated and water-cooled reactor
Reactor lineVVER (Voda Voda Energo Reactor)
Reactor types4 VVER-1200 reactors
Main parameters of the reactor core
Fuel (fissile material)235U (NU/SEU/LEU)
Fuel stateSolid
Neutron energy spectrumThermal
Primary control methodControl rods
Primary moderatorWater
Primary coolantLiquid (light water)
Reactor usage
Primary useGeneration of electricity
Power (electric)4800MW

Kostroma Nuclear Power Plant is a proposed, but as-yet non-existent nuclear power plant that was to be erected in the Buysky District, of Kostroma Oblast in Russia.

History

[edit]

In the mid-1970s within the erstwhile Soviet Union, it was decided by the Soviet Council of Ministers under chairman Alexei Kosygin that a nuclear power plant would be constructed in Kostroma, using two RBMKP-2400 generation II reactor cores.[1]

Construction began in 1979, with several design changes made throughout; in the 1980s, Soviet planners decided to build two RBMK-1500 reactors instead. In the aftermath of the 1986 Chernobyl disaster, the plant's design was again re-drawn to use VVER-1000 reactors.[2] All construction came to a complete stop in 1990, not long before the collapse of the Soviet Union. In the '90s, a proposal was made to build two VPBER-600 reactors (variants of the VVER-640 design)[citation needed], but the proposal never reached production stage.

On 8 December 1996, further construction was rejected by referendum with 87% voting against. By 1999, the Kostroma Regional Court and later Supreme Court of the Russian Federation ruled the Kostroma Oblast Duma decision to hold a referendum (date 25 April 1996, No. 278) illegal.[citation needed]

Per resolution No. 1574 of the Kostroma Oblast Duma, date 1 March 2007, all resolutions preventing construction were cancelled and, therefore, construction was to resume in earnest; on-site switchgear had already been installed that could handle up to 500kV.[citation needed]

Resumed construction efforts (2008)

[edit]

On 14 October 2008, Kostroma's regional governor was presented with a Declaration of Intent to invest in the construction of two power units, signed by Rosatom State Corporation's then General Director, Sergey Kiriyenko.[3] Public hearings held in 2009 discussed the potential environmental impact for power units No. 1 and 2 of the plant. Construction of the plant was also referenced by a government scheme to improve energy infrastructure within Russia, approved for construction until the year 2030 by order of the Russian government.[citation needed]

It was decided that the plant would be built in stages: between 2016 and 2020, two power units would be built using the VVER-1200 design with a capacity of 2300MW. Later, two additional units would have been installed for a total capacity of 4600MW.[4]

Construction canceled again (2011)

[edit]

By April 2011, Rosatom had received a license from Russian energy regulator Rostekhnadzor, authorising construction. In the end, Rosatom canceled all construction plans.[5]

To this day, the Kostroma Nuclear Power Plant has never been built.

References

[edit]
  1. ^ Доллежаль Н. А. У истоков рукотворного мира: Записки конструктора — М.: Знание, 1989 — Трибуна академика — 256с.
  2. ^ Луконин Н. Ф. Атомная энергетика СССР. Текущие проблемы и перспективы показателей АЭС. Журнал «Атомная энергия». Том 63, вып. 5. 1987 год. Электронная библиотека «История Росатома» — [1]
  3. ^ Анастасия Денисова. Буйскую АЭС возродят // Ведомости.ru, 15.10.2008
  4. ^ www.dp.ru со ссылкой на RIA Novosti и долгосрочную генеральную схему размещения объектов электроэнергетики (13 March 2008). "В России построят четыре АЭС". Санкт-Петербург: Delovoy Peterburg. ISSN 1606-1829.[dead link]
  5. ^ ""Росатом" в ближайшие годы не планирует строительство Центральной АЭС". РИА Новости. 2011-04-19. Archived from the original on 2012-03-11. Retrieved 2011-05-11.
[edit]

See also

[edit]
Arc.Ask3.Ru: конец переведенного документа.
Arc.Ask3.Ru
Номер скриншота №: 9b835fec2cc1e97618f66fef47a098f1__1717591740
URL1:https://arc.ask3.ru/arc/aa/9b/f1/9b835fec2cc1e97618f66fef47a098f1.html
Заголовок, (Title) документа по адресу, URL1:
Kostroma Nuclear Power Plant - Wikipedia
Данный printscreen веб страницы (снимок веб страницы, скриншот веб страницы), визуально-программная копия документа расположенного по адресу URL1 и сохраненная в файл, имеет: квалифицированную, усовершенствованную (подтверждены: метки времени, валидность сертификата), открепленную ЭЦП (приложена к данному файлу), что может быть использовано для подтверждения содержания и факта существования документа в этот момент времени. Права на данный скриншот принадлежат администрации Ask3.ru, использование в качестве доказательства только с письменного разрешения правообладателя скриншота. Администрация Ask3.ru не несет ответственности за информацию размещенную на данном скриншоте. Права на прочие зарегистрированные элементы любого права, изображенные на снимках принадлежат их владельцам. Качество перевода предоставляется как есть. Любые претензии, иски не могут быть предъявлены. Если вы не согласны с любым пунктом перечисленным выше, вы не можете использовать данный сайт и информация размещенную на нем (сайте/странице), немедленно покиньте данный сайт. В случае нарушения любого пункта перечисленного выше, штраф 55! (Пятьдесят пять факториал, Денежную единицу (имеющую самостоятельную стоимость) можете выбрать самостоятельно, выплаичвается товарами в течение 7 дней с момента нарушения.)