Line 9 (Chongqing Rail Transit)
Line 9 | ||
---|---|---|
Overview | ||
Native name | 重庆轨道交通9号线 | |
Status | Operational | |
Line number | 9 | |
Locale | Chongqing, China | |
Termini | ||
Stations | 31 (29 in operation) | |
Website | https://www.cqmetro.cn | |
Service | ||
Type | Rapid transit | |
System | Chongqing Rail Transit | |
Services | 1 | |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | |
Depot(s) | Xinqiao, Taiwan Industrial Park, Huashigou | |
History | ||
Opened | 25 January 2022[1] | |
Technical | ||
Line length | 32.29 km (20.06 mi)[2][3] (Phase 1) 7.8 km (4.8 mi)[4] (Phase 2) | |
Number of tracks | 2 | |
Character | Mostly underground with little sections elevated | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |
Electrification | Overhead line, 1,500 V DC | |
Operating speed | 100 km/h (62 mph) (Maximum) | |
|
Line 9 of CRT is a rapid transit line in Chongqing, China.
History
[edit]The line began construction on September 28, 2016.
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Gaotanyan – Xingke Ave.[a][1] | 25 January 2022 | 31.3 km (19.4 mi) | 23 | Phase 1 |
Baoshenghu | 28 July 2022[5] | infill station | 1 | |
Xingke Ave. – Huashigou | 18 January 2023 | 7.8 km (4.8 mi)[6] | 5 | Phase 2 |
- ^ except Cruise Port and Baoshenghu stations.
Stations
[edit]Service routes |
Station No. |
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
Xinqiao | 新桥 | - | 0.0 | Shapingba | |||||
● | ● | Gaotanyan | 高滩岩 | 1.9 | 1.9 | ||||
● | ● | Tianlilu | 天梨路 | 1.2 | 3.0 | ||||
● | ● | Shapingba | 沙坪坝 | 1 Loop 27 CYW |
1.3 | 4.3 | |||
● | ● | Xiaolongkan | 小龙坎 | 1 | 1.0 | 5.3 | |||
● | ● | Tuwan | 土湾 | 1.1 | 6.3 | ||||
● | ● | Hongyancun | 红岩村 | 5 | 1.2 | 7.6 | Yuzhong | ||
● | ● | Fuhualu | 富华路 | 18 | 1.1 | 8.7 | |||
● | ● | Hualongqiao | 化龙桥 | 1.9 | 10.6 | ||||
● | ● | Lijiaping | 李家坪 | 1.6 | 12.2 | Jiangbei | |||
● | ● | Mahuangliang | 蚂蝗梁 | 0.9 | 13.0 | ||||
● | ● | Guanyinqiao | 观音桥 | 3[a] | 1.0 | 14.0 | |||
● | ● | Liyuchi | 鲤鱼池 | 10 | 1.7 | 15.7 | |||
● | ● | Liujiatai | 刘家台 | 1.2 | 16.9 | ||||
● | ● | Jiangbeicheng | 江北城 | 6 | 1.0 | 17.9 | |||
● | ● | Wulidian | 五里店 | 6 Loop | 1.2 | 19.1 | |||
● | ● | Gailanxi | 溉澜溪 | 1.0 | 20.1 | ||||
● | ● | Toutang | 头塘 | 4 | 1.7 | 21.9 | |||
● | ● | Baoshuigang | 保税港 | 4 | 1.4 | 23.2 | |||
| | | | Cruise Port | 邮轮母港 | 0.9 | 24.1 | ||||
● | ● | Hejialiang | 何家梁 | 0.7 | 24.8 | ||||
● | ● | Shipanhe | 石盘河 | 1.6 | 26.4 | Yubei | |||
● | ● | Shangwanlu | 上湾路 | 10 | 1.9 | 28.3 | |||
● | ● | Qinggangping | 青岗坪 | 1.7 | 30.0 | ||||
● | ● | Baoshenghu | 宝圣湖 | 15 | 2.0 | 32.0 | |||
● | ● | Xingke Ave. | 兴科大道 | 1.2 | 33.2 | ||||
● | Chunhua Ave. | 春华大道 | 2.3 | 35.5 | |||||
● | Langui Ave. | 兰桂大道 | 1.0 | 36.5 | |||||
● | Central Park East | 中央公园东 | 10 | 1.2 | 37.6 | ||||
● | Congyansi | 丛岩寺 | 2.6 | 40.2 | |||||
● | Huashigou | 花石沟 | 1.1 | 41.3 | |||||
- ^ out of system transfer
Station details
[edit]Xingke Ave. station
[edit]Xingke Ave. station[7] (Chinese: 兴科大道站; pinyin: Xīngkēdàdào zhàn) is located in the Yubei District. The station opened on January 25, 2022.[8] There are four exits for this station. Currently only two exits (numbered 1 and 3) are opening.[9]
Gallery
[edit]-
Xingke Ave. station of Line 9
-
Gaotanyan station of Line 9
-
Interior of a Line 9 train
References
[edit]- ^ Jump up to: a b "轨道九号线一期本月开通运营".
本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
- ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022.
全长32.289km;共设站26座,本次开通的车站23座
- ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
- ^ "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.
- ^ "重庆地铁9号线一期宝圣湖站28日14时开通运营".
- ^ "重庆地铁9号线二期通过项目工程验收".
重庆地铁9号线二期工程(兴科大道—花石沟)线路全长约7.8公里,共设5座车站
- ^ "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on April 17, 2022.
- ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022.
- ^ "带你探站9号线——兴科大道站 回兴片区又多了一个轨道站". January 28, 2022. Archived from the original on June 21, 2022. Retrieved June 21, 2022.