Future Science City station
Beijing Subway station | |||||||||||
General information | |||||||||||
Location | Interchange between Weilaikexuecheng Road (未来科学城路) and Yingcai South 1st Street (英才南一街) Beijing Future Science City Lutuan Village (鲁疃村), Beiqijia, Changping District, Beijing People's Republic of China | ||||||||||
Coordinates | 40°06′51″N 116°27′38″E / 40.11424°N 116.46043°E | ||||||||||
Managed by | Beijing MTR | ||||||||||
Line(s) |
| ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2023 | ||||||||||
Previous names | Weilai Kejicheng Nanqu (未来科技城南区) Future Science City South (未来科学城南) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Future Science City station (Chinese: 未来科学城站; pinyin: Wèilái Kēxuéchéng Zhàn) is an underground station of Beijing Subway Line 17. It opened on 30 December 2023.[1][2] It is also called Weilɑikexuecheng Zhɑn.
Location
[edit]The station is located in the Beijing Future Science City, in the Lutuan Village (鲁疃村), Beiqijia, Changping, Beijing.[3]
History
[edit]The construction of the station started in 2016.[4] The station was called Weilai Kejicheng Nanqu (Chinese: 未来科技城南区; pinyin: Wèilái Kējìchéng Nánqū; lit. 'South Area of Future Science and Technology City') at the time.
In 2021, the station was renamed as Future Science City South.[5] In 2023, the station was officially named as Future Science City station.
The structure of the station was completed no later than 2022.[6]
Station layout
[edit]Future Science City station is an underground station with a total length of 496.8 metres, a total width of the main structure of 23.7 metres and a platform length of 186 metres, with a platform width of 14 metres.[7]
The station has three underground floors and one island platform. Future Metropolitan, a TOD property near the station is developed by Poly Real Estate.[8]
There are 4 exits, lettered A, B, C and D. Exits A and C lead to Yingcai South 1st Street, and Exits B and D lead to Weilaikexuecheng Road. Exit A is accessible.
-
Middle of the concourse [1]
-
Middle of the concourse [2]
-
Faregates at the north of the concourse
-
Middle of the platform
References
[edit]- ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29.
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
- ^ "北京地铁17号线北段计划今年底开通试运营_中新社_北京分社". www.bj.chinanews.com.cn (in Simplified Chinese). Retrieved 2023-12-18.
- ^ "地名公告" (in Simplified Chinese). 2023-07-01. Archived from the original on 2023-07-01. Retrieved 2023-12-19.
- ^ "北京地铁17号线两站率先开工 一车站将建最长站台". news.lqsbcl.net (in Simplified Chinese). Retrieved 2023-12-19.
- ^ "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF) (in Simplified Chinese).
- ^ 北京企业信息技术有限公司. "未来科学城科创服务平台". saas-wlc-vue. Retrieved 2023-12-19.
- ^ 北京地铁17号线01标项目经理部 (Feb 2016). "北京地铁17号线01标施工测量方案". 北京地铁17号线01标施工测量方案 (in Simplified Chinese). 中铁十六局集团有限公司. Archived from the original on 19 August 2021. Retrieved 19 Dec 2023.
{{cite journal}}
: CS1 maint: numeric names: authors list (link) - ^ "【探盘】地铁上盖央企环绕 保利未来大都汇打造京北最大科技商办综合体--房产--人民网". house.people.com.cn. Retrieved 2023-12-19.