Чангинг Южный Железнодорожный вокзал
![]() Платформа | |||||||||||
Китайское имя | |||||||||||
китайский | Чангинг Южная станция | ||||||||||
| |||||||||||
Общая информация | |||||||||||
Расположение | Changping Boulevard (常平大道), Banshi Estate (板石村), Changping, Dongguan, Guangdong Китай | ||||||||||
Coordinates | 22°58′41″N 114°00′09″E / 22.978056°N 114.0025°E | ||||||||||
Owned by | Pearl River Delta Metropolitan Region intercity railway | ||||||||||
Operated by | Guangdong Intercity Railway Operation Co., Ltd. | ||||||||||
Line(s) | Guangzhou–Huizhou intercity railway | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | FPQ (Pinyin: CPN) | ||||||||||
History | |||||||||||
Opened | 28 December 2017 | ||||||||||
Services | |||||||||||
|
Чангинг Южный Железнодорожный вокзал ( китайский : Чангинг Южный Станция ; Пинин : Чангпинг Нан Чжан ; Jyutping : Soeng 4 пинг 4 Имя 4 Заам 6 ) железнодорожный вокзал в Чанпинге , Дунгуан , Гуандун , Китай . Он открылся 28 декабря 2017 года. [ 1 ]
На станции запланировано 4 выхода, AD. Выходы A и D открылись, когда станция открылась. Выход B был построен, но не открыт, и выход C, который еще не начал строительство, зарезервирован для подключения к будущей транзитной станции Dongguan Rail . [ 2 ] Кроме того, существует отрывок, соединяющийся с Sianglong Tiandi Plaza рядом с выходом A, но в настоящее время он временно закрыт из -за неадекватных требований последнего в пожарной безопасности. [ 3 ]
История
[ редактировать ]The station was named Changping during planning and construction and was originally an elevated station. In 2010, after the Ministry of Railways intervened in the construction of the Pearl River Delta Metropolitan Region intercity railway, the line scheme was redesigned. Finally, at the suggestion of Dongguan City and the towns and streets along the line, in order to avoid cutting the urban planning, the urban area of Dongguan and the Liaobu and Changping sections were changed from elevated to underground, so the station was adjusted to an underground station, and moved about 1km eastward to the current site.[4]: 87, 92–97 However, due to the poor geological conditions of Changping, there were many collapse accidents during the construction of the Changping section of the Dongguan-Huizhou intercity, which affected the construction period of the station.[5]
In order to avoid the same name as the national railway station, the station was named Changping South at the end of 2015.[6]
Transfer
[edit]Changping Station of the Beijing-Kowloon railway is located on the north side of the station, but the straight-line distance between the two stations is about 1.3 kilometers, and the transfer convenience is not as good as that of the next station, Changping East/Dongguan East, so the operator did not mark this station as an interchange station with the China Railway.[7][8] The planned Dongguan Rail Transit Line 3 plans to set up a station near this station, and the station has reserved the conditions for a transfer passageway.[2]
Gallery
[edit]-
Concourse turnstiles
-
Exit A
References
[edit]- ^ 刘光明宝 (2017-12-29). "惠州小金口至东莞道滘全程约60分钟" [The journey from Huizhou Xiaojinkou to Dongguan Daojiao takes about 60 minutes]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-04. Retrieved 2024-08-09 – via Sina Corporation.
- ^ Jump up to: a b "【头条】莞惠城轨年底即将全线开通投入营运" [[Headline] Dongguan-Huizhou urban rail will be fully opened and put into operation by the end of the year]. Changping Town People's Government (in Simplified Chinese). 2017-12-14. Archived from the original on 2024-06-23. Retrieved 2024-08-09 – via Southern Network.
- ^ "东莞市常平镇常平南站地下通往翔龙天地卷闸门未开" [The rolling gate leading to Xianglong Tiandi from Changping South Station in Changping Town, Dongguan City is not open]. Sunshine Hotline Government Inquiry Platform (in Simplified Chinese). 2024-01-15. Archived from the original on 2024-06-23. Retrieved 2024-08-09.
- ^ "东莞至惠州城际轨道交通项目(变更)环境影响报告书(全本公示)" [Dongguan to Huizhou Intercity Rail Transit Project (Change) Environmental Impact Report (Full Publication)]. China Railway Engineering Design Consulting Group Co., Ltd. (in Simplified Chinese). 2015-11-20. Archived from the original on 2019-05-10. Retrieved 2024-08-09.
- ^ "莞惠城轨施工3年至少20次事故 专家:因投资不够" [At least 20 accidents occurred in the construction of Dongguan-Huizhou urban rail in 3 years. Experts: due to insufficient investment]. Southern Metropolis Daily (in Simplified Chinese). 2015-11-22. Archived from the original on 2024-06-03. Retrieved 2024-08-09 – via CNR.
- ^ Gong ( 2015-11-12 . ) Ping 2018 . -02-27
- ^ «Как перейти на национальную железную дорогу и метро на межгородных железных дорогах Гуанчжоу и Гуанчжоуаоцинг ? Держите ] . это руководство
- ^ «Относительно бесшовного соединения между станцией Чангинга Южным и Станцией Чантинг» беспроблемного соединения между Станцией Чанга-Южного и Чанпинга [ Относительно . ] -06-23 .
Внешние ссылки