StatusDecommissioning in progress
Commission date1967
Decommission date2012
Owner(s)CEGB (1967-90), Nuclear Decommissioning Authority
Operator(s)CEGB (1967-90), Magnox Ltd
Nuclear power station
Reactors2
Reactor typeMagnox
Reactor supplierThe Nuclear Power Group
Cooling towersNone
Cooling sourceSea water
Power generation
Units operational4 × 216 MW
Make and modelAssociated Electrical Industries
C. A. Parsons and Company
Units decommissioned2 X 217 MW
Nameplate capacity434 MW
626 MW (Planned)
Annual net output3,288.453 GWh (1980/81)
External links
CommonsRelated media on Commons

Атомная электростанция Oldbury - это Magnox атомная электростанция , которая подвергается выводу из эксплуатации . Он расположен на южном берегу реки Северн недалеко от деревни Олдбери-на-Северн в Южном Глостершире , Англия . Продолжающийся процесс вывода вывода управляется Magnox Ltd , дочерней компанией Управления по эксплуатации ядерного вывода (NDA).

Олдбери - одна из четырех бывших атомных электростанций, расположенных недалеко от устья реки Северн и Бристольского канала , остальные - Беркли , Хинкли Пойнт А и Хинкли Пойнт б .

Oldbury in 1967

Открыто в 1967 году, у него было два Magnox, реактора производящих 424   мегаватт (MWE) в общей сложности [ 1 ] [ 2 ] – enough electricity on a typical day to serve an urban area twice the size of Bristol. Reactor 1 went critical on 18 September 1967 and first generated electricity on 9 November 1967. Reactor 2 started generating electricity in April 1968.[3]

The construction was undertaken by a consortium known as The Nuclear Power Group ('TNPG').[4] The reactors were supplied by TNPG and the turbines by AEI and C. A. Parsons & Co.[2] The main civil engineering contractor was Sir Robert McAlpine.[2] Construction on the site began in 1961.[3]

Oldbury was the first nuclear power station in the UK to use prestressed concrete pressure vessels, earlier Magnox reactors having used steel pressure vessels more suited to smaller reactors.[5]

The design net power output of the station was 626 MWe, but due to steel corrosion problems from the hot carbon dioxide coolant within the reactor, operating temperature had to be reduced soon after operation started causing a large drop in power output. Initially, the power output was set at 424 MWe, dropping to 400 MWe by 1973. Then as remedial measures were adopted, power was progressively increased to 434 MWe by 1983 with a gas outlet temperature of 365 °C (689 °F), compared to the 412 °C (774 °F) design temperature, which was maintained as the normal operational output.[1][6]

The station had two 216 MW turbo-alternator generators giving a gross electrical capability of 439.5 MW and a net capability of 416 MW.[7] The steam conditions at the turbine stop valves was 43.0 bar at 389 °C (732 °F).

The generating capacity, electricity output, load factor and thermal efficiency were as shown in the table.[8]

Year Net capability, MW Electricity supplied, GWh Load as percent of capability, % Thermal efficiency, %
1972 633.5 3,069.722 87.4 28.3
1979 439.4 3,044.545 83.5 27.98
1981 439.5 3,288.453 90.2 26.8
1982 439.5 3,339.707 91.6 27.09
1984 434 2,945.387 77.3 27.61

In 1976/77, Oldbury was presented with the Hinton Cup, the CEGB's "good house keeping trophy". The award was commissioned by Sir Christopher Hinton, the first chairman of the CEGB.

In 1992, Reactor one set a world record for the longest continuous period of power generation from a commercial nuclear reactor, of 713 days 21 hours and 32 minutes.[9] Hinkley Point A Nuclear Power Station held the previous world record of 700 days and 7 hours, set in 1988.

From 2005 until 2012, the power station was protected by armed officers from the Civil Nuclear Constabulary.

Closure and decommissioning

[edit]

The station was originally to cease generating at the end of 2008, however continued use was licensed in various stages; an additional 2.5 years in the case of reactor 2, and four years for reactor 1. [10][11][12][13]

Reactor 2 ceased operating permanently on 30 June 2011,[14] followed by Reactor 1 on 29 February 2012.[15]

Defuelling and removal of most buildings is expected to take until 2027, followed by a care and maintenance phase from 2027 to 2095. Demolition of reactor buildings and final site clearance is planned for 2096 to 2101.[16]

Incidents

[edit]

On 30 May 2007, only a few days after reopening after safety checks, the power station was shut down as part of standard emergency procedure when a fire broke out on one of the generator transformer HV bushings. No-one was injured in the fire and no radiation was released. Information suggests an insulator overheated, causing it to fail. Minor damage ensued resulting in a standard shutdown. All emergency procedures were commenced, and by 11:30 am the situation was stabilised.[17][18] The power station resumed production for a few days in June then shut down again. Production eventually resumed on 24 August 2007, at which point it had only produced electricity for eight days since August 2006.[19]

On 17 March 2011 at 10:40 am, Reactor 2 was automatically shut down after an electrical problem.[20] Magnox stated that workers had been carrying out routine maintenance when a small relay overheated (this failure caused the turbine to shut down). Their spokesman went on to say, "Because the turbine tripped the steam produced in the boilers couldn't be sent to the turbine as it would normally and so was released through relief valves on top of the building." and "To reduce the amount of steam being produced, and in accordance with expectations, the reactor automatically tripped and was safely shut down."[21]

On 14 July 2011, Reactor 1 was automatically shut down after 'problems with the refuelling machinery.' Again steam was released to remove the decay heat.[22]

Silt lagoons

[edit]

The silt lagoons at Oldbury power station are used as a high tide roosting site by birds which feed on the Severn Estuary. Between 1979 and 2005, 199 bird species were recorded at the site.[23] This included a number of vagrants: a green-winged teal in January 2001, a ring-necked duck in April and May 2000, a black-winged stilt in May 1997, a Kentish plover in August 1993, a semipalmated sandpiper in August 1990, a Temminck's stint in April 1984, a pectoral sandpiper in September 1989, a broad-billed sandpiper in August 1983, a ring-billed gull in October 1994, and a Richard's pipit in October 1996.[23]

Oldbury B

[edit]

Horizon Nuclear Power, an E.ON and RWE joint venture, announced in 2009 intentions to install up to 3,300 MWe of new nuclear plant at Oldbury. Horizon were considering building up to either two 1,650 MWe Areva EPR reactors, or three 1,100 MWe Westinghouse AP1000 reactors. As the Severn estuary water supply would be inadequate to cool these larger reactors, cooling towers would be built.[24][25]

On 18 October 2010, the British government announced that Oldbury was one of the eight sites it considered suitable for future nuclear power stations.[26]

On 29 March 2012, E.ON and RWE npower announced that their plans to build the new power station had been shelved.[27]

In late 2012, it was announced that Hitachi had bought the UK Nuclear project from E.ON & RWE. It planned to build ABWR (Advanced Boiling Water Reactors) at this site along with Wylfa Newydd, the lead site. Construction would not have started until Wylfa Newydd was operational, in order to learn from experience and correct problematic aspects that arose during construction. However, Hitachi suspended work on Wylfa and Oldbury in January 2019.[28]

In September 2020, Hitachi announced its withdrawal from the Oldbury and Wylfa projects. It will close down its development activities, but will work with the UK government and other stakeholders to facilitate future options for the two sites.[29]

In April 2022, it was announced that Oldbury and Wylfa sites are candidates for two sets of EPR reactors to be constructed as the UK Plans to construct up to eight new reactors this decade. These sites would be part of the next set of plants with the first being Hinkley Point C and Sizewell C. The Oldbury and Wylfa sites are likely to begin construction next parliament.[clarification needed][30][31][32]

On 6 March 2024, the UK Government announced it was buying both the Wylfa and Oldbury sites from Hitachi for £160m.[33]

[edit]

Oldbury was used as a filming location for the 1976 Doctor Who serial, The Hand of Fear.[citation needed]

On one occasion, rock band Slade recorded a performance for Top of the Pops inside one of the reactor buildings.[3]

The power station also appeared in several episodes of the BBC Science fiction series Blake's 7.[34]

See also

[edit]

References

[edit]
  1. ^ Jump up to: a b "United Kingdom of Great Britain and Northern Ireland: Nuclear Power Reactors". PRIS database. International Atomic Energy Agency. 22 May 2010. Archived from the original on 28 June 2011. Retrieved 22 May 2010.
  2. ^ Jump up to: a b c "Arquivo.pt". arquivo.pt. Archived from the original on 19 July 2009. Retrieved 7 April 2022.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  3. ^ Jump up to: a b c "History of Oldbury Power Station - MyThornbury".
  4. ^ Wearne, S.H. "Evolution of UK Contract Structure for Nuclear Power New Build" (PDF). University of Manchester. Retrieved 16 July 2020.
  5. ^ Walter C. Patterson (1985). Going Critical: An Unofficial History of British Nuclear Power (PDF). Paladin. ISBN 0-586-08516-5. Retrieved 12 June 2009.
  6. ^ Инспекция ядерных установок (сентябрь 2000 г.). Отчет HM -инспекции по ядерным установкам о результатах долгосрочных обзоров безопасности Magnox (LTSR) и периодических обзоров безопасности (PSRS) (PDF) (отчет). Исполнительный директор по охране здоровья и безопасности . п. 27 (Таблица 3). Архивировано из оригинала (PDF) 26 мая 2006 года . Получено 21 марта 2010 года .
  7. ^ Статистический ежегодник CEGB , 1981, CEGB, Лондон
  8. ^ Статистический ежегодник CEGB 1972-84, CEGB, Лондон.
  9. ^ Агентство по ядерной энергии ОЭСР (1992). Урановые ресурсы, производство и спрос: совместный отчет . Организация экономического сотрудничества и развития. п. 204
  10. ^ «Олдбери держат в 2009 году» . НДА. 18 декабря 2008 года. Архивировано из оригинала 25 мая 2011 года . Получено 21 июля 2011 года .
  11. ^ Шапс, Каролин (23 августа 2010 г.). «Magnox стремится управлять британским реактором Oldbury Reactor до середины 2012 года» . Рейтер. Архивировано с оригинала 7 марта 2016 года . Получено 21 июля 2011 года .
  12. ^ Шапс, Каролин (9 февраля 2011 г.). «Олдбери 2 ядерная единица может работать до июня - Magnox» . Рейтер. Архивировано с оригинала 5 марта 2016 года . Получено 21 июля 2011 года .
  13. ^ «Олдбери 1 ядерный реактор получает расширение 2012 года» . Рейтер. 22 июня 2011 г. Получено 21 июля 2011 года . [ мертвая ссылка ]
  14. ^ «Олдбери -атомная электростанция реактор 1 закрыт» . Би -би -си. 14 июля 2011 года . Получено 14 июля 2011 года .
  15. ^ «Электростанция Oldbury, чтобы прекратить генерировать электричество» . Би -би -си. 21 октября 2011 года . Получено 21 октября 2011 года .
  16. ^ «Инвентаризация радиоактивных отходов в Великобритании 2010 года: основной отчет» (PDF) . Агентство по выводу ядерного вывода/Министерство энергетики и изменения климата. Февраль 2011 года. Архивировано из оригинала (PDF) 25 марта 2012 года . Получено 22 мая 2012 года .
  17. ^ «Ядерный реактор установлен для повторного запуска» . BBC News . 18 мая 2007 г. Получено 30 мая 2007 года .
  18. ^ «Огонь закрывает атомную электростанцию» . BBC News . 30 мая 2007 г. Получено 30 мая 2007 года .
  19. ^ «Власть снова на атомной станции» . BBC News . 24 августа 2007 г. Получено 24 августа 2007 года .
  20. ^ Шапс, Каролин (17 марта 2011 г.). «Олдбери 2 ядерная единица закрывается после проблем с электрической точкой» . Рейтер . Архивировано с оригинала 7 апреля 2016 года . Получено 1 июля 2011 года .
  21. ^ «Ядерные боссы дают гарантии после того, как Steam появляется от реактора в Олдбери» . Gazetteseries.co.uk . 24 марта 2011 года . Получено 1 июля 2011 года .
  22. ^ «Олдбери -атомная электростанция реактор 1 закрыт» . Bbc.co.uk. ​14 июля 2011 года . Получено 1 июля 2011 года .
  23. ^ Jump up to: а беременный Middleton, AJ, DH Payne и JDR Vernon (2007). Птицы Олбери Силовой станции иловые лагуны Бристоль Орнитология 28: 3–40
  24. ^ Джеймс Мюррей (30 апреля 2009 г.). «RWE/E.ON и EDF выигрывают ядерный аукцион» . BusinessGreen . Получено 11 ноября 2010 года .
  25. ^ "Часто задаваемые вопросы: Oldbury" . Горизонт ядерная энергетика . Получено 11 ноября 2010 года .
  26. ^ «Ядерная энергетика: восемь участков, выявленных для будущих растений» . BBC News . Би -би -си. 18 октября 2010 года. Архивировано с оригинала 19 октября 2010 года . Получено 18 октября 2010 года .
  27. ^ «RWE и E.ON HALT UK ядерные планы в Wylfa и Oldbury» . Би -би -си. 29 марта 2012 года . Получено 29 марта 2012 года .
  28. ^ «Wylfa Newydd: Hitachi, чтобы остановить работу по атомной станции Великобритании» . BBC News . Би -би -си . 17 января 2019 года . Получено 17 января 2019 года .
  29. ^ «Hitachi выходит из британского проекта New -Build: корпоративные - мировые ядерные новости» . www.world-nuclear-news.org .
  30. ^ «Великобритания планирование быстрой ядерной экспансии: ядерная политика - Всемирные ядерные новости» . www.world-nuclear-news.org .
  31. ^ «Борис Джонсон планирует обширное расширение ядерной энергии, но наносятся на наборные ветровые амбиции» . inews.co.uk . 6 апреля 2022 года.
  32. ^ «По словам министра, Великобритания может построить семь атомных электростанций» . Рейтер . 2 апреля 2022 года - через www.reuters.com.
  33. ^ Динс, Дэвид; Льюис, Гарет (6 марта 2024 г.). «Бюджет: правительство Великобритании, чтобы купить сайт Wylfa в сделке с 160 миллионами фунтов стерлингов» . BBC News . Получено 6 марта 2024 года . Г -н Хант сказал, что сделка будет стоить 160 миллионов фунтов стерлингов, что включает в себя сайт Oldbury в Глостершире.
  34. ^ «Названия с местом, соответствующим атомной электростанции Олдбери» . IMDB . Получено 30 сентября 2012 года .
[ редактировать ]
Arc.Ask3.Ru: конец переведенного документа.
Arc.Ask3.Ru
Номер скриншота №: 0410270c477a2807fd2b7ea24d5bfda9__1726169640
URL1:https://arc.ask3.ru/arc/aa/04/a9/0410270c477a2807fd2b7ea24d5bfda9.html
Заголовок, (Title) документа по адресу, URL1:
Oldbury nuclear power station - Wikipedia
Данный printscreen веб страницы (снимок веб страницы, скриншот веб страницы), визуально-программная копия документа расположенного по адресу URL1 и сохраненная в файл, имеет: квалифицированную, усовершенствованную (подтверждены: метки времени, валидность сертификата), открепленную ЭЦП (приложена к данному файлу), что может быть использовано для подтверждения содержания и факта существования документа в этот момент времени. Права на данный скриншот принадлежат администрации Ask3.ru, использование в качестве доказательства только с письменного разрешения правообладателя скриншота. Администрация Ask3.ru не несет ответственности за информацию размещенную на данном скриншоте. Права на прочие зарегистрированные элементы любого права, изображенные на снимках принадлежат их владельцам. Качество перевода предоставляется как есть. Любые претензии, иски не могут быть предъявлены. Если вы не согласны с любым пунктом перечисленным выше, вы не можете использовать данный сайт и информация размещенную на нем (сайте/странице), немедленно покиньте данный сайт. В случае нарушения любого пункта перечисленного выше, штраф 55! (Пятьдесят пять факториал, Денежную единицу (имеющую самостоятельную стоимость) можете выбрать самостоятельно, выплаичвается товарами в течение 7 дней с момента нарушения.)